MW LOS Survey

The main purpose of LOS surveys is to ensure an MW connection to the sites to determine a Line of Site clearance. It is the LOS survey. It is completed by physically inspecting areas between every two sites and the chosen sites for acquisition.

This survey is extremely important as any failure of LOS could cause delays in the project and then a loss. LOS survey is conducted using the following steps:

Share: